The basics
Manufacturers refurbish for reasons that are mostly operational. A floor that cannot take a heavier machine, lighting that is too dim for quality checks, a roof that leaks onto stock, or a layout that makes forklifts take the long way round. The work often has to be done around production, in sections, or over a shutdown. A phased plan, doing one bay at a time while the others keep producing, usually costs more in contractor time but protects output and customer deliveries.
That makes the cost two-sided. There is the contractor’s bill, and there is the output lost while a line is moved or a bay is out of use. Lenders tend to be more comfortable with refurbishment where the benefit is clear, such as a layout that raises throughput, or an energy upgrade that lowers running costs in a measurable way. Insurers sometimes drive the work too, by asking for fire separation or better storage, and a written recommendation from them can help explain the project to a lender.